The Project

The throughput of trains was limiting the ultimate capacity of the terminal.  A complete automatic multi-part unloading system was custom built to increase the capacity of the unloading system from 1 million tonnes per annum to 1.5 million tonnes per annum.  We modelled the system and optimized complex sequencing operations for optimized cycle times.

Results

  • 18% improvement in capacity over and above upgrade.