The Project

Two additional berths were added to the existing Dalrymple Bay Coal Terminal infrastructure in parallel with the Ship-loader 3 addition.  This system includes numerous conveyors with complex sequencing and spillage return systems.  

Results

  • System was commissioned with no impact to existing terminal production.